This JVTC report identifies potential maintenance improvements and suggests
maintenance actions which will support the reliability of the SSAB railway transport
logistic system. Representatives from SSAB, Duroc Rail AB, EuroMaint, AAE, JVTC
and SWECO have contributed to this report.
The SSAB railway transport system needs an extra 23.5% wheel-sets waiting to be
used in the maintenance process. Failure mode 331 represents 73 % of all maintained
wheel axles. SSAB cost of re-wheeling (IS3) is 12.8 times higher than re-profiling
(IS1). LKAB/MTAB cost for IS3 is 4-5 times higher than IS1 cost per wheel-set. An
increase in IS1 and a decrease in IS3 lower the total maintenance cost. This result is in
line with the full scale test performed by SSAB in 2011.
More extensive studies on availability, reliability, maintainability, recoverability and
maintenance supportability of the transport system should be carried out to find key
performance indicators. The goal is to determine mean failure rate, decrease
downtime and support maintenance.
SSAB should establish holistic maintenance processes jointly with the maintenance
contractors to ensure consistent application of maintenance and enhanced
maintenance support. The work can be organized and managed by a consultancy
company with experience in railway operation and maintenance issues.Contractors must agree on a transparent maintenance information system that
includes the following information: wheel-set status descriptions and location data;
preventive and corrective maintenance task descriptions; history of preventive and
corrective maintenance actions; reports of failures and defects (failure catalogue),
including the operating condition when the failure is discovered; condition monitoring
data from detectors and manual inspections; economic and maintenance performance
data.
A new work order system should be developed with maintenance tasks based on
updated information from the contractors. The work order requests can be triggered
automatically by the maintenance information in the system data on predetermined
triggers such as wayside detector information, calendar time, elapsed time since last
task, and travel distance; alternatively, they can be initiated manually during
inspections.


Länk till publikation i fulltext (pdf-fil, 967,0 kB. Öppnas i nytt fönster)

Författare: Isabelle Lindsund ; Per-Olof Larsson-Kråik ; Mikael Palo
Utgivare: Luleå tekniska universitet
Utgivningsdatum: 2012
Diarienummer: TRV 2011/58769
Antal sidor: 26
Språk: Engelska
Kontaktperson: Per Olof Larsson Kråik, UHjbs


Trafikverket, Postadress: 781 89 Borlänge, Telefon: 0771-921 921